new caster plates installed
installing the strut and installing the screw in clamp and coil springs
installing the pinto rack along with the clamp for the rack from aje
Since I went with the SN95 spindle assembly I put on the hub from a set of Cobra calipers and slot/ drilled rotors
if you do the front you might as well do the back right!
column modified
installing the D-shaft
had to go from a front sump to a Rear sump pan. We had to get a certain pick up tube to clear the stud girdle and nock a little dent in part of the stock 90's pan for it to clear along with weld in a bung for the oil drain from the turbo.
engine reinstall
header install... look at all that room. I could of installed the headers on the block then installed it but we didn't want to chip any of the paint.
installing the strut and installing the screw in clamp and coil springs
installing the pinto rack along with the clamp for the rack from aje
Since I went with the SN95 spindle assembly I put on the hub from a set of Cobra calipers and slot/ drilled rotors
if you do the front you might as well do the back right!
column modified
installing the D-shaft
had to go from a front sump to a Rear sump pan. We had to get a certain pick up tube to clear the stud girdle and nock a little dent in part of the stock 90's pan for it to clear along with weld in a bung for the oil drain from the turbo.
engine reinstall
header install... look at all that room. I could of installed the headers on the block then installed it but we didn't want to chip any of the paint.