It’s not gonna look like I got anything done,...but I think I did.
Like i said,...it kinda just purrs along.
I spent the morning getting the heater hoses finished, I also thought I was gonna charge the AC system, but the piece of sht O reilly’s evac pump would only pull 15” of vacuum..I know I don’t have a leak, cause it’ll hold 15” of vacuum aa long as I want it to.
So,..that plan piddled away.
I finished the electrical wiring..I needed to create the OD switched circuit.
Obviously so is putting the carpet and console back.
I have a heater, and I’ve got heat. when I get a decent evac pump, Ill have AC.
I spent too much time dicking with the waste gate..It was leaking ( still). I changed back to the elcheapo clamps that came with the gate,..They seem to be working for now.
And while I was out, I stopped at Harbor freight. Fully planning on buying a 56” rolling chest, and a 56” top chest as a replacement for the junk Craftsman boxes I’ve had for 25 years now.
When I got there I was happy to find that they had a floor model 72” rolling chest priced the same as the 56” roller.
So,..for 1350.00 i now have a 72” rolling chest, topped with a 56” chest.
WOOT!