install is now looking like it will be a week from saturday. i think i'm going to run an 8AN line from the tank to the rails. i also need a LOT of little parts so i'm pushing back the install a little. i still need to plumb the nitrous line to the spray bar and hook up a switch. there are about 10 small projects that need to be buttoned up in the next few days
as far as the dyno goes, i have to put 500 miles on the car before it hits the dyno. i'm thinking it will be roughly a month or so till it is back up and going 100%