last PITA done...almost there

blksn955.o

Founding Member
Mar 15, 2002
3,263
0
66
st.louis mo 314
Finaly got around to the last PITA to get my 94 back on the road. I put the stock H pipe back on (getting smog test). I have had the car on jacks for about 1-1.5 months and the O/R H off since the day I put it up on jacks. I just have not had the time or when I did it was 100+ with 89% or more humidity.

All I have left is pick up new upper/lower rad hose, I dont need to but I want too. Pick up 2 bolts/nuts, 2 H pipe rubber hangers, dump oil and ani-freeze in, bleed the front brakes, and load the new tune onto the eec.

I still want to pick up a line lock noid before I bleed the brakes but its not high on the priority list at all.


I am just so happy this part is done the last real nasty/PITA thing.

:D :D :SNSign: :)
 
  • Sponsors (?)


Glad to hear it!

I've been procrastinating on doing some stuff too - just too hot, too muggy and too many mosquitoes out. :D