After looking thru many pic's of engine bays on here and other forums as well as FleeceBay and such.
I started wondering if anybody worries about having too much rubber line for your fuel supply.
Its been some time ago that I went to the tracks, But back then
you could not pass Tech inspection with more than 6 inchs of rubber line.
plus you had to have a double return spring set on the throttle.
Have the rules changed that much in the past 25 years?
Do you run metal tubing fuel line in your engine bay,
Or will you change to it after you get the fire out.
PB
I started wondering if anybody worries about having too much rubber line for your fuel supply.
Its been some time ago that I went to the tracks, But back then
you could not pass Tech inspection with more than 6 inchs of rubber line.
plus you had to have a double return spring set on the throttle.
Have the rules changed that much in the past 25 years?
Do you run metal tubing fuel line in your engine bay,
Or will you change to it after you get the fire out.
PB