CManT1914
New Member
BlackVert said:what should i use for the front and back beads? silicone?
Red RTV. Put a 1/2" bead across the block surface, and let it tack up before setting the intake on. It usually takes about 10 minutes or less, just keep feeling it to see when it gets sticky.